Truckloads of rocks are being transported to the Georgia coast to stabilize an overturned cargo ship until it can be removed in pieces.
The joint response team overseeing salvage of the Golden Ray said in a news release that 6,000 tons (5,443 metric tons) of rock will be placed along the hull of the ship to slow erosion of sand beneath it caused by the tides off St. Simons Island. The rock is being delivered by trucks from Georgia quarries and will be laid around the ship using barges.
The vessel overturned Sept. 8 near the Port of Brunswick. Rescuers drilled into the hull and rescued four crewmen trapped in the ship.
Crews plan to haul the ship away in pieces, saying it cannot be safely righted and refloated intact.
Topics Georgia
Was this article valuable?
Here are more articles you may enjoy.
Accuweather: Winter Storm to Cause Up to $115B in Damage, Economic Losses
Owner of Assisted Living Home Where 10 Died in Fire Denied Access to Insurance Funds
Charges Dropped Against ‘Poster Boy’ Florida Contractor Accused of Insurance Fraud
AIG, Chubb Can’t Use ‘Bump-Up’ Provision in D&O Policy to Avoid Coverage 

